To positively impact the chemical, biological, and overall health of the Commonwealth’s streams, rivers, and lakes by reducing the quantity and improving the quality of stormwater runoff from the MS4 after construction has been completed.
Post-Construction Stormwater Management refers to activities that take place after construction occurs and includes structural and non-structural controls to obtain permanent stormwater management over the life of the property’s use. As a key element of the Nation’s and Commonwealth’s strategy for achieving the goals of the Clean Water Act, the MS4’s Post-Construction program must:
Activities that are part of the University’s Stormwater Quality Management Plan include:
For more information regarding the University’s efforts to meet these MCM requirements please see our SWQMP and Annual Report sections. Here you will find information about our planned tasks, measurable goals, and scheduling as well as information on activities conducted each year. To learn more about Stormwater BMPs on campus please visit our Post-Construction BMPs section.